Case: Fortarock

PROJECT MANAGEMENT
LIGHT AND RIGGING
  • Date

    1 June 2018

  • Services

    -ENGINEERING
    -PLANNING
    -PRODUCTION

    View all services

    ENGINEERING
    -Technical Design
    -Structural Engineering
    -Database Software
    PLANNING &
    COMMUNICATION
    -Project Management
    -Team & Equipment
    PRODUCTION
    -Co-Creation

Commisioned by Ecolicht, 4Light took care of the disciplines Light and Rigging at Fortarock. The stage roof at this event was filled entirely with fixtures with hardly any empty spaces left on the truss. To these trusses labels were attached that came from 4Light’s automated system. Which means that even after replacing a fixture, everything stays properly documented.

To be prepared for the visiting acts’ accompanying floor sets, extra data and multi cables were placed at various spots on the field. So that if any of the visiting acts needed to, they could easily connect their own fixtures and technical equipment onto the existing infra.