Unlimited Productions engaged 4Light to analyse the light design and to translate it into a technically buildable whole. A project with various challenges, among them the large number of technical items and fixtures that had to be loaded in and unloaded within a short space of time.

The roof construction consisted of LED tubes, suspended from DMX-controlled winches, which provided the creative forms and organic movements. Due to the diversity of materials and the large number of technical items and fixtures, the choice was made to work with rental companies from the Netherlands, Belgium, Germany and the Czech Republic.

The period between the design until the show was only three weeks, whereby the area had to be readied within 48 hours, meaning the fine tuning of the software was carried out at the venue in the meantime.